title: How long does it take to get a sign permit?
description: Generally a sign permit takes 3 days – 2 weeks to process depending on the process of the municipality. Should a sign require a deviation or variance
---

[![Leedesignsllc](https://www.leedesignsllc.com/hs-fs/images/logo.png)](https://www.leedesignsllc.com/)

## Florida's Premier Sign Company

### (239)-278-4245

- [![](https://www.leedesignsllc.com/hs-fs/images/facebook.png) ](https://www.facebook.com/LeeDesignsllc?ref=ts&fref=ts)
- [![](https://www.leedesignsllc.com/hs-fs/images/linkedin.png)](https://www.leedesignsllc.com/resorces/faq/bid/237889/How-long-does-it-take-to-get-a-sign-permit#)
- [![](https://www.leedesignsllc.com/hs-fs/images/googleplus.png)](https://www.leedesignsllc.com/resorces/faq/bid/237889/How-long-does-it-take-to-get-a-sign-permit#)
- [![](https://www.leedesignsllc.com/hs-fs/images/twitter.png)](https://www.leedesignsllc.com/resorces/faq/bid/237889/How-long-does-it-take-to-get-a-sign-permit#)
- [![](https://www.leedesignsllc.com/hs-fs/images/yelp.png)](http://www.yelp.com/biz/lee-designs-llc-fort-myers)

# Business Signage FAQs

## How long does it take to get a sign permit?

- [Tweet](https://twitter.com/share)

Generally a sign permit takes 3 days – 2 weeks to process depending on the process of the municipality. Should a sign require a deviation or variance, it can take up to several months. The sign contractor should be able to explain the sign permit process and the average time frame.